_ap_ufes{"success":true,"siteUrl":"globalinsights360.com","urls":{"Home":"https://globalinsights360.com","Category":"https://globalinsights360.com/category/accounts/","Archive":"https://globalinsights360.com/2025/08/","Post":"https://globalinsights360.com/class-o-timber-cesmm4/","Page":"https://globalinsights360.com/general-topics/","Attachment":"https://globalinsights360.com/natures-01-jpg/","Nav_menu_item":"https://globalinsights360.com/1586/","Custom_css":"https://globalinsights360.com/astra/","Wp_template":"https://globalinsights360.com/archive/","Wp_template_part":"https://globalinsights360.com/post-meta/","Wp_global_styles":"https://globalinsights360.com/wp-global-styles-twentytwentyfour/","Wp_navigation":"https://globalinsights360.com/navigation/","Elementor_library":"https://globalinsights360.com/?elementor_library=default-kit","Bnfw_notification":"https://globalinsights360.com/?bnfw_notification=1393"}}_ap_ufee
Skip to content
Global Insights
  • Home
  • Accounting Notes
  • Civil Engg Notes
  • Engineering Notes
  • General Topics
  • Home
  • Jobs Info
  • privacy policy
  • Study Materials
Top Stories
Class O: Timber (CESMM4)
August 30, 2025
Class N: Miscellaneous Metalwork (CESMM4)
August 29, 2025
Class M: Structural Metalwork (CESMM4)
August 29, 2025
Class L – Pipework: Supports and Protection, Ancillaries to Laying and Excavation
August 29, 2025
Class K – Pipework: Manholes and Pipework Ancillaries
August 29, 2025
Class J – Pipework: Fittings and Valves
August 29, 2025
CESMM4 – Class I: Pipework (Pipes)
August 29, 2025
CESMM4 – Class H: Precast Concrete
August 29, 2025
CESMM4 – Class G: Concrete Ancillaries
August 28, 2025
CESMM4 – Class F: In Situ Concrete
August 28, 2025
CESMM4 – Class E: Earthworks
August 28, 2025
CESMM4 – Class D: Demolition and Site Clearance
August 28, 2025
Class C – Geotechnical and Other Specialist Processes (CESMM4)
August 28, 2025
Class B – Ground Investigation (CESMM4)
August 28, 2025
General Items (Class A) – CESMM4
August 28, 2025
Preparation of the Bill of Quantities (CESMM4)
August 27, 2025
CESMM4 – Application of Work Classification
August 27, 2025
CESMM4 – General Principles
August 27, 2025
CESMM4 – Definitions
August 27, 2025
Ready-Mix Concrete (RMC) & Site Works – Thumb Rules
August 27, 2025
Thumb Rules for Reinforcement Steel
August 27, 2025
Thumb Rules for Concrete Works – Civil Engineers & QS
August 27, 2025
Advanced Interview Q&A Quantity Surveyor / Billing Engineer / Contracts Engineer
August 27, 2025
Consolidated Master Table for IS 1200 (Part 1–35)
August 27, 2025
IS 1200 – Part 35: Demolition and Dismantling
August 27, 2025
IS 1200 – Part 34: Structural Glazing and Cladding
August 27, 2025
IS 1200 – Part 33: Horticulture and Gardening Works
August 27, 2025
IS 1200 – Part 32: Surface Dressing and Landscaping
August 27, 2025
IS 1200 – Part 31: Asphalt/Bituminous Works
August 27, 2025
🔹 IS 1200 – Part 30: Roadwork (General)
August 27, 2025
🔹 IS 1200 – Part 29: Damp Proof Course (DPC)
August 27, 2025
IS 1200 – Part 28: Water Proofing
August 27, 2025
IS 1200 – Part 27: Gas Supply and Distribution Pipelines
August 27, 2025
IS 1200 – Part 26: Sewer Lines
August 27, 2025
IS 1200 – Part 25: Water Supply, Plumbing, and Drains
August 27, 2025
IS 1200: Method of Measurement of Building and Civil Engineering Works (Part 1–24)
August 27, 2025
IS 1200 – Part 24: Well Foundations
August 27, 2025
IS 1200 – Part 23: Piling
August 27, 2025
IS 1200 – Part 22: Steel Reinforcement and Fabrication
August 27, 2025
IS 1200 – Part 21: Woodwork and Joinery
August 27, 2025
IS 1200 – Part 20: General Building Work (Miscellaneous Items)
August 27, 2025
IS 1200 – Part 19: Water Supply, Plumbing and Sanitary Installations
August 27, 2025
IS 1200 – Part 18: Demolition and Dismantling
August 27, 2025
IS 1200 – Part 17: Steelwork and Ironwork
August 27, 2025
IS 1200 – Part 16: Woodwork and Joinery
August 27, 2025
IS 1200 – Part 15: Glazing
August 27, 2025
IS 1200 – Part 14: Painting, Polishing, Varnishing, Enamelling
August 27, 2025
IS 1200 – Part 13: Whitewashing, Colour Washing, Distempering, and Other Finishing Works
August 27, 2025
IS 1200 – Part 12: Plastering & Pointing
August 27, 2025
IS 1200 – Part 11: Steel Reinforcement & Misc. Metal Work
August 27, 2025
IS 1200 – Part 10: Carpentry & Joinery (Timber Works)
August 27, 2025
IS 1200 – Part 9: Roof Coverings (Sheets/Tiles/Shingles)
August 27, 2025
IS 1200 – Part 8: Steel Work (Structural)
August 27, 2025
IS 1200 – Part 6: Formwork (Centering & Shuttering)
August 27, 2025
IS 1200 – Part 5: Reinforced Brick/Stone/Concrete
August 27, 2025
IS 1200 – Part 4 (Methods of Measurement of Building and Civil Engineering Works – Stone Masonry)
August 27, 2025
IS 1200 – Part 3 (Methods of Measurement of Building and Civil Engineering Works – Brickwork)
August 27, 2025
IS 1200 – Part 2 (Methods of Measurement of Building and Civil Engineering Works – Concrete Works)
August 27, 2025
IS 1200 – Part 1 (Methods of Measurement of Building and Civil Engineering Works – Earthwork)
August 27, 2025
Quantity Surveyor / Billing Engineer Interview Questions & Answers
August 27, 2025
Surveying: Definition and Overview
July 25, 2024
Mod of Measurement for RCC Work as per CPWD Specifications
July 20, 2024
Earth Excavation and Filling
July 20, 2024
World’s First 3D Printed Steel Bridge in Amsterdam
July 19, 2024
IS: 432 (Part I) – 1982: Mild Steel and Medium Tensile Steel Bars
July 19, 2024
Estimation and Costing Basic Notes
July 19, 2024
Current Affairs 18-07-2024
July 18, 2024
Rules governing the conduct-Civil Servants
July 17, 2024
Supreme Court Judgment on Muslim Women’s Right to Maintenance
July 17, 2024
COMMON ENERGY CONSERVATION MEASURES
July 16, 2024
Latent and Patent Defects in Construction Projects
July 16, 2024
Inspection Checklist for Concrete Placement
July 16, 2024
Compressive Strength of Mortar -Mix Ratio and Cube Test
July 16, 2024
Work Procedure of Excavation at Construction Site
July 16, 2024
Anti-Termite Treatment – Types, Chemicals, Prevention and Safety
July 16, 2024
Plain Cement Concrete (PCC)- Work Procedure
July 16, 2024
Specifications of Brickwork in Superstructure
July 16, 2024
Penetration Value of Bitumen -Determination for Road Construction
July 16, 2024
Substructure and Superstructure in Building Construction
July 16, 2024
Time Value of Money – Construction
July 16, 2024
The 11 Most Popular Construction Estimating Software
July 15, 2024
IS 1200-7 1972 ” hardware”
July 13, 2024
IS: 1200 (Part VI) – 1974 ; refractory work
July 13, 2024
IS: 1200 (Part V) – 1982 ; formwork
July 13, 2024
IS 1200 Part -4 “stone masonry”
July 13, 2024
IS 1200-3 (1976): Brickwork
July 13, 2024
IS 1200 Part 2
July 13, 2024
OneNote Tutorial
July 10, 2024
Google Classroom Tutorial
July 10, 2024
Types of AI Agents
July 9, 2024
Types of Artificial Intelligence
July 9, 2024
History of Artificial Intelligence
July 9, 2024
Applications of AI
July 9, 2024
Artificial Intelligence (AI) Introduction
July 9, 2024
How Interest Works on a Savings Account
July 9, 2024
Financial Statements of a Company
July 9, 2024
Issue and Redemption of Debentures
July 8, 2024
Accounting for Share Capital
July 8, 2024
Dissolution of Partnership Firm
July 8, 2024
Reconstitution of a Partnership Firm — Retirement/Death of a Partner
July 8, 2024
Posted inCivil Engineering Notes

Class O: Timber (CESMM4)

This class covers timber materials and timber works in civil engineering and building projects. It includes formwork, temporary works, joinery, carpentry, and permanent timber items like doors, windows, and fittings.…
Continue Reading
August 30, 2025No Comments
Posted inCivil Engineering Notes

Class N: Miscellaneous Metalwork (CESMM4)

This class covers metal items that do not fall under structural metalwork (Class M) but are still essential for civil engineering and building works. These are typically secondary, non-structural, or…
Continue Reading
August 29, 2025No Comments
Posted inCivil Engineering Notes

Class M: Structural Metalwork (CESMM4)

Structural metalwork refers to all fabricated steel and metallic components forming part of a civil engineering project. This includes primary structural elements (beams, columns, trusses), secondary components (bracing, purlins, handrails),…
Continue Reading
August 29, 2025No Comments
Posted inCivil Engineering Notes

Class L – Pipework: Supports and Protection, Ancillaries to Laying and Excavation

1. Scope Class L covers all ancillary works required during pipe-laying and pipe excavation, including: Pipe supports (when not included in Class K structural supports). Pipe protection (encasement, wrapping, coating,…
Continue Reading
August 29, 2025No Comments
Posted inCivil Engineering Notes

Class K – Pipework: Manholes and Pipework Ancillaries

1. Scope Class K covers manholes, chambers, access points, and other ancillary structures associated with pipelines. It also includes ancillary works such as pipe supports, thrust blocks, anchor blocks, and…
Continue Reading
August 29, 2025No Comments
Posted inCivil Engineering Notes

Class J – Pipework: Fittings and Valves

Scope Covers pipe fittings, valves, specials, and other components associated with pipe systems. Applies to both above-ground and below-ground pipework. Complements Class I (Pipes). Excludes: Pipe lengths themselves → Class…
Continue Reading
August 29, 2025No Comments
Today Best Trending Topics
Current Affairs 18-07-2024
Rules governing the conduct-Civil Servants
Supreme Court Judgment on Muslim Women’s Right to Maintenance
Posted inCivil Engineering Notes

Latent and Patent Defects in Construction Projects

Construction defects are caused as a result of various deficiencies such as poor building materials and workmanship or faulty design. They can be categorized into patent or latent defects. Patent (visible) defects are defects…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Inspection Checklist for Concrete Placement

Inspection of concreting works is an important step to achieve greater strength and durability of the structure. Although it is easy to remember number of checks during inspection of concrete…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Compressive Strength of Mortar -Mix Ratio and Cube Test

Compressive Strength of Mortar: Testing and Significance The compressive strength of mortar is a critical parameter in determining the durability and load-bearing capacity of masonry structures. Mortar, a mixture of…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Work Procedure of Excavation at Construction Site

Excavation Process in Construction Excavation is a crucial phase in construction, involving the movement of earth, rock, or other materials using tools, equipment, or explosives. It includes trenching, wall shafts,…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Anti-Termite Treatment – Types, Chemicals, Prevention and Safety

Anti-Termite Treatment: Comprehensive Protection for Buildings Anti-termite treatment is an essential chemical procedure designed to protect soil, masonry, wood, and electrical fixtures from subterranean termites. This process establishes a chemical…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Plain Cement Concrete (PCC)- Work Procedure

Plain Cement Concrete (PCC) in Building Construction Plain Cement Concrete (PCC) is essential in construction, acting as a protective layer between the soil or water and reinforcement concrete. This guide…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Specifications of Brickwork in Superstructure

Brick masonry stands as a fundamental element in superstructure construction, its integrity vital for structural stability. Ensuring the quality of materials utilized is paramount, as subpar components compromise the efficacy…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Penetration Value of Bitumen -Determination for Road Construction

The penetration value test on bitumen serves as a crucial measure of its hardness and consistency. Specifically, a bitumen grade like 80/100 signifies that its penetration value falls within the…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Substructure and Superstructure in Building Construction

Substructure and Superstructure in Building Construction In building construction, projects are divided into two main components: the substructure and the superstructure. Each part plays a crucial role in the overall…
Read More
July 16, 2024No Comments
Posted inCivil Engineering Notes

Time Value of Money – Construction

Time Value of Money The concept of the time value of money (TVM) is crucial for both investing and borrowing. It essentially states that a sum of money today is…
Read More
July 16, 20241

Posts pagination

Previous page 1 … 6 7 8 9 10 … 13 Next page
August 2025
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Jul    
  • Accounts
  • Artificial Intelligence
  • Civil Engineering Notes
  • Daily GK News
  • Microsoft Office
  • Money Wealth
  • Class O: Timber (CESMM4)
  • Class N: Miscellaneous Metalwork (CESMM4)
  • Class M: Structural Metalwork (CESMM4)
  • Class L – Pipework: Supports and Protection, Ancillaries to Laying and Excavation
  • Class K – Pipework: Manholes and Pipework Ancillaries

1972 Method of measurement of building and civil engineering works Brickwork building materials cash book CESMM2 CESMM3 CESMM4 checklist Construction Estimating Software Construction Projects CPWD Specifications ERP Estimating Estimating Software Financial Accounting Standards Board Financial Statements Financial Statements of a Company interview questions is 1200 is 1200 concrete IS 1200 Part -4; Method of measurement of building and civil engineering works IS 1200 Part 2 is1200 part 4 IS 1200-3 IS 1200-3 (1976) IS 1200-3 (1976): Method of Measurement of Building and Civil Engineering Works IS 1200-7 IS: 1200 (Part V) IS: 1200 (Part V) - 1982 ; formwork IS: 1200 (Part V) - 1982 ; method of measurement of formwork IS: 1200 (Part VI) IS: 1200 (Part VI) - 1974 ; method of measurement of refractory work IS: 1200 (Part VI) - 1974 ; refractory work Latent and Patent Defects in Construction Projects Measurement of Building and Civil Engineering Works (Concrete Works) Part 4: stone masonry Part 7: hardware Part III placement refractory work Software Substructure and Superstructure Substructure and Superstructure in Building Construction Superstructure Trial Balance and Rectification of Errors

Archives

  • August 2025
  • July 2024

Categories

  • Accounts
  • Artificial Intelligence
  • Civil Engineering Notes
  • Daily GK News
  • Microsoft Office
  • Money Wealth
Copyright 2025 — Global Insights. All rights reserved.
Scroll to Top