Scope:
Covers measurement of dismantling/demolition of structures, including concrete, masonry, woodwork, steelwork, flooring, roofing, etc.
Unit of Measurement:
- m³ → for dismantling brickwork, concrete, stone masonry.
- m² → for flooring, plastering, roofing sheets.
- Running metre → for pipes, railings, cables.
- Number (No.) → for doors, windows, fittings, sanitary items.
Classification:
- By material: masonry, concrete, timber, steel, tiles, plaster.
- By method: manual/mechanical.
- With or without salvaging materials.
Special Notes:
- Includes necessary scaffolding, stacking, disposal.
- Usable materials recovered are credited back.
- Rates include safety precautions and segregation of waste.