_ap_ufes{"success":true,"siteUrl":"globalinsights360.com","urls":{"Home":"https://globalinsights360.com","Category":"https://globalinsights360.com/category/accounts/","Archive":"https://globalinsights360.com/2025/08/","Post":"https://globalinsights360.com/class-n-miscellaneous-metalwork-cesmm4/","Page":"https://globalinsights360.com/general-topics/","Attachment":"https://globalinsights360.com/natures-01-jpg/","Nav_menu_item":"https://globalinsights360.com/1586/","Custom_css":"https://globalinsights360.com/astra/","Wp_template":"https://globalinsights360.com/archive/","Wp_template_part":"https://globalinsights360.com/post-meta/","Wp_global_styles":"https://globalinsights360.com/wp-global-styles-twentytwentyfour/","Wp_navigation":"https://globalinsights360.com/navigation/","Elementor_library":"https://globalinsights360.com/?elementor_library=default-kit","Bnfw_notification":"https://globalinsights360.com/?bnfw_notification=1393"}}_ap_ufee
Skip to content
Global Insights
  • Home
  • Accounting Notes
  • Civil Engg Notes
  • Engineering Notes
  • General Topics
  • Home
  • Jobs Info
  • privacy policy
  • Study Materials

Civil Engineering Notes

Posted inCivil Engineering Notes

CESMM4 – Class D: Demolition and Site Clearance

1. Scope Covers all works connected with demolition, dismantling, and clearance required prior to new construction. Includes: Demolition of buildings, structures, foundations. Dismantling of steelwork, plant, machinery. Removal and disposal…
Read More
August 28, 2025No Comments
Posted inCivil Engineering Notes

Class C – Geotechnical and Other Specialist Processes (CESMM4)

This class covers all specialist geotechnical works that improve ground strength, stability, permeability, or prepare the foundation ground before and during construction. While Class B (Ground Investigation) is about understanding…
Read More
August 28, 2025No Comments
Posted inCivil Engineering Notes

Class B – Ground Investigation (CESMM4)

Ground investigation items are included in the BOQ to cover the exploration, sampling, testing, and reporting of subsurface conditions before or during construction. This class ensures that the contractor accounts…
Read More
August 28, 2025No Comments
Posted inCivil Engineering Notes

General Items (Class A) – CESMM4

General Items are non-measurable works or costs that are essential for the execution of the project but cannot be classified under the normal measurable work classes (earthworks, concrete, etc.). They…
Read More
August 28, 2025No Comments
Posted inCivil Engineering Notes

Preparation of the Bill of Quantities (CESMM4)

The Bill of Quantities (BOQ) is the central document prepared under CESMM4, which provides structured information on work quantities to allow contractors to tender accurately and enable valuation during execution.…
Read More
August 27, 202513
Posted inCivil Engineering Notes

CESMM4 – Application of Work Classification

The work classification is the foundation of CESMM4. It ensures that every item of civil engineering work is described and measured consistently across projects. 1. Purpose of Work Classification Provides…
Read More
August 27, 2025No Comments
Posted inCivil Engineering Notes

IS 1200 – Part 1 (Methods of Measurement of Building and Civil Engineering Works – Earthwork)

Published by: Bureau of Indian Standards (BIS) Comprehensive handbook with IS clauses explained, examples, illustrations, BOQ samples, deductions, case studies, checklists, and practical applications. Section 1 – Introduction Purpose of…
Read More
August 27, 2025No Comments
Posted inCivil Engineering Notes

Mod of Measurement for RCC Work as per CPWD Specifications

Introduction Reinforced Cement Concrete (RCC) work involves the use of concrete reinforced with steel bars, mesh, or fibers to enhance its tensile strength. The Central Public Works Department (CPWD) provides…
Read More
July 20, 2024No Comments
Posted inCivil Engineering Notes

Earth Excavation and Filling

1. Introduction Earth excavation and filling are fundamental processes in construction and civil engineering. They involve the removal of soil, rock, or other materials from one location (excavation) and the…
Read More
July 20, 2024No Comments
World’s First 3D Printed Steel Bridge in Amsterdam
Posted inCivil Engineering Notes

World’s First 3D Printed Steel Bridge in Amsterdam

Introduction: Launch Date: July 2021 Location: Amsterdam Developer: MX3D (Dutch Robotics Company) in collaboration with a consortium of experts Significance: Represents a major milestone in 3D printing technology About the…
Read More
July 19, 2024No Comments

Posts pagination

Previous page 1 2 3 4 5 Next page
August 2025
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Jul    
  • Accounts
  • Artificial Intelligence
  • Civil Engineering Notes
  • Daily GK News
  • Microsoft Office
  • Money Wealth
  • Class N: Miscellaneous Metalwork (CESMM4)
  • Class M: Structural Metalwork (CESMM4)
  • Class L – Pipework: Supports and Protection, Ancillaries to Laying and Excavation
  • Class K – Pipework: Manholes and Pipework Ancillaries
  • Class J – Pipework: Fittings and Valves

1972 Method of measurement of building and civil engineering works Brickwork building materials cash book CESMM2 CESMM3 CESMM4 checklist Construction Estimating Software Construction Projects CPWD Specifications ERP Estimating Estimating Software Financial Accounting Standards Board Financial Statements Financial Statements of a Company interview questions is 1200 is 1200 concrete IS 1200 Part -4; Method of measurement of building and civil engineering works IS 1200 Part 2 is1200 part 4 IS 1200-3 IS 1200-3 (1976) IS 1200-3 (1976): Method of Measurement of Building and Civil Engineering Works IS 1200-7 IS: 1200 (Part V) IS: 1200 (Part V) - 1982 ; formwork IS: 1200 (Part V) - 1982 ; method of measurement of formwork IS: 1200 (Part VI) IS: 1200 (Part VI) - 1974 ; method of measurement of refractory work IS: 1200 (Part VI) - 1974 ; refractory work Latent and Patent Defects in Construction Projects Measurement of Building and Civil Engineering Works (Concrete Works) Part 4: stone masonry Part 7: hardware Part III placement refractory work Software Substructure and Superstructure Substructure and Superstructure in Building Construction Superstructure Trial Balance and Rectification of Errors

Archives

  • August 2025
  • July 2024

Categories

  • Accounts
  • Artificial Intelligence
  • Civil Engineering Notes
  • Daily GK News
  • Microsoft Office
  • Money Wealth
Copyright 2025 — Global Insights. All rights reserved.
Scroll to Top