Consolidated Master Table for IS 1200 (Part 1–35)

Part No.ScopeUnit of MeasurementClassificationSpecial Notes1Earthwork (excavation, filling, banking, etc.)m³, m², m, tonneType (excavation/filling), Soil/Rock, Lead/Lift, DewateringTimbering/shoring included; Deduction for pits >0.5 m²2Concrete Work (plain/reinforced)m³, m²Mix type, Thickness, Reinforcement inclusionCentring/shuttering included…